Berwick Child Development Centre – Phase 1 Complete

Phase 1 of our renovations to the Berwick Child Development Centre Building at UBC are now complete. The original building was built in 1976 and was a model facility at the time providing child care for children with developmental disabilities. Berwick is a facility full of joy, warmth and vitality which our design work sought to enhance whilst providing the practical upgrades required.

Construction work is being phased over the summer of 2020 and 2021 to allow for continuous operation of the facility.

Photos by Bob Matheson